[PATCH] drm/sched: fix the bug of time out calculation(v3)

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

 



issue:
in cleanup_job the cancle_delayed_work will cancel a TO timer
even the its corresponding job is still running.

fix:
do not cancel the timer in cleanup_job, instead do the cancelling
only when the heading job is signaled, and if there is a "next" job
we start_timeout again.

v2:
further cleanup the logic, and do the TDR timer cancelling if the signaled job
is the last one in its scheduler.

v3:
change the issue description
remove the cancel_delayed_work in the begining of the cleanup_job
recover the implement of drm_sched_job_begin.

TODO:
1)introduce pause/resume scheduler in job_timeout to serial the handling
of scheduler and job_timeout.
2)drop the bad job's del and insert in scheduler due to above serialization
(no race issue anymore with the serialization)

Signed-off-by: Monk Liu <Monk.Liu@xxxxxxx>
---
 drivers/gpu/drm/scheduler/sched_main.c | 25 ++++++++++---------------
 1 file changed, 10 insertions(+), 15 deletions(-)

diff --git a/drivers/gpu/drm/scheduler/sched_main.c b/drivers/gpu/drm/scheduler/sched_main.c
index a2a9536..ecf8140 100644
--- a/drivers/gpu/drm/scheduler/sched_main.c
+++ b/drivers/gpu/drm/scheduler/sched_main.c
@@ -676,13 +676,7 @@ drm_sched_get_cleanup_job(struct drm_gpu_scheduler *sched)
 {
 	struct drm_sched_job *job, *next;
 
-	/*
-	 * Don't destroy jobs while the timeout worker is running  OR thread
-	 * is being parked and hence assumed to not touch pending_list
-	 */
-	if ((sched->timeout != MAX_SCHEDULE_TIMEOUT &&
-	    !cancel_delayed_work(&sched->work_tdr)) ||
-	    kthread_should_park())
+	if (kthread_should_park())
 		return NULL;
 
 	spin_lock(&sched->job_list_lock);
@@ -693,17 +687,21 @@ drm_sched_get_cleanup_job(struct drm_gpu_scheduler *sched)
 	if (job && dma_fence_is_signaled(&job->s_fence->finished)) {
 		/* remove job from pending_list */
 		list_del_init(&job->list);
+
+		/* cancel this job's TO timer */
+		cancel_delayed_work(&sched->work_tdr);
 		/* make the scheduled timestamp more accurate */
 		next = list_first_entry_or_null(&sched->pending_list,
 						typeof(*next), list);
-		if (next)
+
+		if (next) {
 			next->s_fence->scheduled.timestamp =
 				job->s_fence->finished.timestamp;
-
+			/* start TO timer for next job */
+			drm_sched_start_timeout(sched);
+		}
 	} else {
 		job = NULL;
-		/* queue timeout for next job */
-		drm_sched_start_timeout(sched);
 	}
 
 	spin_unlock(&sched->job_list_lock);
@@ -791,11 +789,8 @@ static int drm_sched_main(void *param)
 					  (entity = drm_sched_select_entity(sched))) ||
 					 kthread_should_stop());
 
-		if (cleanup_job) {
+		if (cleanup_job)
 			sched->ops->free_job(cleanup_job);
-			/* queue timeout for next job */
-			drm_sched_start_timeout(sched);
-		}
 
 		if (!entity)
 			continue;
-- 
2.7.4




[Index of Archives]     [Linux USB Devel]     [Linux Audio Users]     [Yosemite News]     [Linux Kernel]     [Linux SCSI]

  Powered by Linux