On Thu, 2014-07-17 at 14:51 +0800, Daniel Veillard wrote: > Plan is to get the new release on Friday Aug 1st, so > I think this mean entering freeze at some point on the > preceeding week-end, I will be travelling then, but I > should be able to do that at some point saturday 26. > We already have 180 commits in since 1.2.6 so deinitely > makes sense to push this month too, It would be good if someone could push my 3 patches around LXC keep/drop capabilities before 1.2.7 freeze. Those were ACKed by Daniel during 1.2.6 freeze. -- Cedric -- libvir-list mailing list libvir-list@xxxxxxxxxx https://www.redhat.com/mailman/listinfo/libvir-list