Re: backup02 io scheduler change

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

 



> I think this is a good test to see what is the problem. The deadlocks
> and OOM's seem to happen at 0400 when other virtual systems are

Hrm... so all of these are xen instances and they're doing backups at
the same time. If the rsync processes are going into a D state I'd
think it's an I/O exhaustion problem. Would it be possible to alter
the backup schedule and stagger them if the scheduler change doesn't
work?

-Adam
_______________________________________________
infrastructure mailing list
infrastructure@xxxxxxxxxxxxxxxxxxxxxxx
https://admin.fedoraproject.org/mailman/listinfo/infrastructure


[Index of Archives]     [Fedora Development]     [Fedora Users]     [Fedora Desktop]     [Fedora SELinux]     [Yosemite News]     [KDE Users]

  Powered by Linux