I am about to Upgradde pt6 zikula to Zikula 1.1.2 The upgrade process should take between 10-20 Minutes using the zikula patch files.
I have backed up the database to : /usr/share/zikula-preupgrade-backup
The Theme has been copied to the theme SVN as mentioned in a previous email to the designs list.
Regards,
Keiran Smith
- Fedora Ambassador / BugZapper / Designer - <affix@xxxxxxxxxxxxxxxxx>
- Free Software Foundation Associate - <keiran.smith@xxxxxxxxxxxxxx>
- http://keiran-smith.net
- Call me on +44 (0) 131 208 4347
_______________________________________________ Fedora-infrastructure-list mailing list Fedora-infrastructure-list@xxxxxxxxxx https://www.redhat.com/mailman/listinfo/fedora-infrastructure-list